Golden Orb Project
This prospect is located approximately 700 metres to the south and along strike from the Wattle Dam Gold Mine. No work has been conducted at this prospect since that reported in the March 2007 quarter that included encouraging intersections such as 7 metres @ 11.4g/t Au from 90 metres (WDRC197) in primary mineralisation.
An RC drill program for approximately 1500 metres is planned to further evaluate the prospect.
An RC drill program for approximately 1500 metres is planned to further evaluate the prospect.